Bathroom Complete

The bathroom project has been mostly completed for months now, but we finally installed the magnetic latches on vanity doors, and then took some gratuitous staged beauty shots to celebrate.
So, without further ado, enjoy!


View from the hall, including the new shellac'd door.


Original commode with Bemis Classic Colors Ming Green seat - ReStore mirror medicine cabinet with handsome cat.


Detail of the lights salvaged from Belmont - and the interior vanity drawer.


Handsome cat on the Craigslist counter - close view of the Craigslist sink and World of Tile toothbrush holder.


Sterling ‘Starscape’ shower door - and the Hall-Mack Towel Ladder.


Hall-Mack towel bar and Sterling ‘Starscape’ shower door (bonus flamingo robe!)



Interior of the shower - inset Tile Redi Niche Tripl, Shower Trim with Fresnel Lens in Chrome, Union Brass mixer and taps.


This is the internet, so one more cat pic for good measure!


Tuesday, November 17, 2015

Week 5 Bathroom Remodel - and a huge Thank You

Post delayed approximately 6 months due to hard drive crash, loss of project photos, and resulting chronic apathy.  Sorry about that.



If week 4 shouldn't have been, I don't really know what to say about week 5, other than perhaps ugly-cry about having this project finally be (functionally) done.
Over the weekend, we discovered that the shower was spraying as much water into our basement as it was on the person in the tub.  The plumber was returning Monday to finish the sink drain pop-up, so he took a look at the shower also, and discovered a joint in the PEX which had not been crimped, and was causing the leaks.  Correcting this necessitated cutting or enlarging access holes in the drywall of our hall linen closet, and removing the drawer supports.  In apology, the plumber replaced the guts of the toilet tank, which were causing the overfilling and leaks.
The electricians arrived early Monday and installed the light fixtures above the vanity, but our switches are still not available for install.  Put that on the punch list.
The general contractor returned Tuesday afternoon to evaluate the holes in the linen closet, and discuss corrective action.  On Wednesday, he came back to tack a board over the ones in the shelf part of the closet, and re-install the drawer supports (leaving those holes open, just in case).
That means most of the remaining tasks are on our to-do list: the medicine cabinet door trim and handles, the vanity cabinet door catches, staining and sealing the door, panting the register and radiator covers, cleaning ev-er-y-thing, and putting all our stuff back!
We do have a bit of accessorizing and decorating on the back burner, too - maybe a bit of stenciling (atomic stars?) in color-matching paint on the walls, adding a clock on the wall by the door, perhaps building having someone else build a storage cabinet for the wall above the commode, and so on and so forth.  Never ending, right?
We did score this adorable tiny trash can the other day, which makes me giggle every time I see it.  It's so tiny!
That leads to a 'products used' round-up, which cannot be accomplished without issuing some huge thank-yous to the Retro Renovation community.  So many of our ideas came from you - but a few particular folks come to mind:
Reader Jennifer - thanks for pointing us to the Sterling ‘Starscape’ shower door.  It is awesome.
Chris and Angela, we totally copied your vanity design when we had ours built.
Patron Saint Pam's many Hall-Mack posts helped us identify the Aristochrome accessories we salvaged from Belmont and used here, including the Towel Bar (492T, 24"), Paper Holder (478),  Towel Ladder (395).
Pam's extensive World of Tile coverage led us to the Saji color-matching trim, toothbrush holder, and the 'special' tile we scored during the liquidation sale.
The article on 6" tub faucets from Pam sent us to Locke Plumbing, who were willing to add a new product (Union Brass 530) to their catalog, when our plumber wanted one of the other options from the manufacturer - talk about service!
And finally, all the thanks in the world to D's parents, who spent three solid weeks of their time on-site, supervising the work.  We could not have this done without their unending support.